MI02 Grand Rapids Data Center

400 76th Street SW
Byron Center, MI 49315

Schedule a Tour

0kW

Critical IT Workload

0

Total Sq. Ft.

0

Whitespace Sq. Ft.

Take a Look Inside

  1. Conference Room
  2. Cage
  3. Cabinet
  4. Biometric Scan
  5. Man-trap
  6. Security Office
  7. UPS
  8. Network
  9. Loading dock
  10. Dual back up generators
  11. HVAC (N + X)
  12. Hardened low profile concrete building
  13. Meet-Me-Cabinet
  14. Clean agent fire suppression
  15. Segmented layout with biometric access

grand rapids Data Center floor plan

Power

  • SLA: 99.995% uptime.
  • Generator: 450 kW, 2N redundancy
  • UPS: 250 kW, 2N redundancy
  • Utility Feeds: 1,500 kVA

Environmental Controls

  • Fire Detection: Clean agent
  • HVAC: 242 tons, N+1

Connectivity

  • On-Net Carriers: Five
  • Cloud Integration: Cross-connects to cloud services and direct access to US Signal’s fiber backbone.

Building and Security

  • Resiliency: Tier 2
  • Access: Biometric
  • Surveillance: 24/7 monitoring by the Technical Operations Center.

Why Grand Rapids

Grand Rapids’ stable, low-disaster-risk climate and growing business base make it a strong Midwest option on its own — and having two facilities in the same market gives customers a genuine in-region redundancy option most single-site markets can’t offer.

 

MI02, on the city’s south side in Byron Center, is a hardened, low-profile facility designed to pair with MI01 for local disaster recovery, without customers needing to look outside the region for a second site. Like every US Signal facility, MI02 meets the same standards for security, compliance, and audited operations. See our full security and compliance standards.

Please Note: This form is for sales and customer inquiries only. We do not accept unsolicited service proposals or vendor solicitations through this form.